Enhance Cleaning VCT Tile
Enhance Strip and Wax Scope of Work
· Contractor will arrive 30 minutes prior to Enhance Strip.
· Contractor will take before and after photos of floor conditions and unopened chemicals.
· Store level will remove kickplates and product/merchandise from bottom shelving and steel perimeters prior to project, so the vendor has full access.
· Contractor or store level will lift or remove base decks and bottom shelving of the perimeter steel racking once product is removed.
· Once contractor has full access, a comprehensive cleaning under gondolas and perimeter steel shelving shall be performed.
· Contractor will use an aggressive pad to strip and ensure the removal of embedded dirt, debris, wax buildup, and discoloration.
· All corners and edges must be scraped of any built-up wax, dirt, or discoloration, and stripped and waxed to match the rest of the floor.
· Cleaning tools and materials may include but are not limited to, razor blades, floor scrapers, putty knives, and Doodlebug Brown Scrub and Strip Pad.
· Use a deck brush to scrub all non-slip tile in front of the fish tank area.
· Apply PetSmart-approved Stripper solution to the floor and scrub the floor using battery-powered low-speed automatic scrubber. Scrub the floor until all excess wax is removed.
· Rinse the floor thoroughly with PetSmart Approved neutral cleaner, allow the floor to completely dry, then pick up all excess moisture with a mop.
· Apply six (6) coats of Client-approved coating/wax for each SW, allowing for thorough drying between coats. The first four (4) coats shall be laid down on the first night, and the remaining two (2) coats shall be laid down the following night. If the Location does not have enough space in the back room for merchandise/product, the full six (6) coats will be applied to half of the Location on the first night and then to the other half of the Location on the second night. (customer will approve additional nights if needed due to the Enhance project).
· Contractor must take before and after pictures in the Mobile App of the wax containers showing that all required wax was applied.
· Contractor must take after pictures in the Mobile App of the stripper containers showing that all old wax was properly removed.
· Once the SW has completed, walk the floor with LOD.
· Contractor shall properly dispose of the excess chemicals in accordance with applicable law.
· Contractor will not dispose of any chemicals on Customer property.
· Lessen will place a follow-up call with the Store Leader within 48 hours of scheduled service to confirm a satisfactory Enhance S&W project
Requirements:
...APC Construction, LLC is seeking a bilingual HR Assistant (Spanish/English) to join our team! This role is ideal for someone who thrives in a fast-paced, growing environment and has a strong attention to detail. Key Responsibilities: Assist with onboarding,...
...on the promise of AI.What is The Role:We are looking for a Video Editor to join the video team at Elastic. Do you enjoy and excel at the... ...: Ability to uphold responsiveness and collaboration in a remote environment. You are an organized self-starter with excellent...
...Ochsner Health Southwestern Louisiana, we understand that our nurse graduates are the future of health care and because of this, we... ...application or on the 75th day following the effective date of the temporary permit; will be transferred to another position within CHRISTUS...
Pomona, CA - Seeking Entry Level ScribeGain Experience Working Side-By-Side With Frontline PhysiciansAs part of our Medical Scribe program, you play a vital role in supporting physicians and health care providers while gaining first-hand knowledge and practical experience...
...Part-time, 20 hours/week Variable day shift between 7:30am to 7:00pm Onsite Summary : The Patient Care Assistant (PCA) assists in delivering individual care for a group of patients under the supervision of a licensed nurse. Responsibilities :...